According to the Supreme Court ruling the City must pay for them about the joint venture.
1.2 million euros.
From reporting facts to the Civil Guard Seprona.
Since the socialist ranks can not leave our amazement at the mass of nonsense to which we are taking the neglect of municipal officials with all that has to do with the land on which projects should be awarded at the time the UTE Caravaca and for which the City has been sentenced to pay a large amount.
Specifically, we are talking about a plot of 5 hectares, inadequate for what was intended to do, with a complicated area because of its difficult terrain, distance and poor access, so no use now, although they were paid to crazy price, nearly 1,200,000 euros, although in reality it seems that if they are having useful because on a recent visit we found huge amounts of debris illegally dumped in different parts of the lands that are within the municipal plot, where have also produced work of filling and subsequent excavation of the rubble, with formation of large slopes.
We wonder who is behind this and why the City allows, if since 2007 this parcel is municipally owned.
We also asked if municipal officials have ever visited.
In any case, we have not seen any action has been taken to prevent access to it, or sign noticing and to deter potential offenders.
Furthermore, we found fully discovered an old well, about 1.5 m in diameter, without the slightest protection.
Is very close to the road that runs along the west side and adjacent to the first ravine that crosses the plot from west to east.
Any person or animal can easily fall with fatal consequences, of what the City would have to answer.
Before this in a motion to ask City Council to take urgent measures on the one hand covering the mouth of that pit and on the other closing down the illegal dumps and preventing access to this area by fencing or placement of barriers that prevent this.
Moreover, these facts will immediately inform the Seprona.
Source: PSOE Caravaca de la Cruz